DR or BC: which one for my SME, and what is the concrete difference?

They are often mentioned together, sometimes as synonyms. They are not. The Disaster Recovery plan (DR) is the IT side: how to restart servers, applications and data after an incident. The Business Continuity plan (BC) is broader: how the whole company keeps running, IT included, but also premises, people, suppliers and customers. The DR plan is a subset of the BC plan. Confusing the two is the first misunderstanding that costs dearly on the day disaster strikes.

The DR plan: getting the information system back on its feet

The DR plan answers a technical, time-bound question: in how long, and with what data, does the information system restart after an outage, a fire, a flood or ransomware. It describes the backups, the restoration procedures, the service restart order, the dependencies between applications, and the recovery objectives quantified process by process.

A DR plan without figures is not a DR plan: it is an intention. The two figures that matter are the RTO (tolerable downtime) and the RPO (volume of data you accept losing). We detail them on a dedicated page, because setting them before you sign avoids the main contractual trap.

The BC plan: keeping the company running

The BC plan starts from the activity, not from the server room. It asks how to keep taking orders, paying salaries, honouring deliveries and answering customers even when part of the resources is missing. It covers scenarios the DR plan ignores: loss of premises, unavailability of a key team, failure of a single supplier, a health crisis.

The BC plan rests on a business impact analysis (BIA) that ranks activities by criticality, then defines for each an acceptable degraded mode and a minimum business continuity objective (MBCO). The DR plan then comes in to bring IT back up to the level the BC plan requires.

A simple rule to remember: you always start from the activity (BC) to derive the technical requirements (DR), never the other way round. A DR plan designed without having quantified the business impact risks protecting first what is easy to back up, not what is vital to the company.

Where to begin as an SME

An SME does not need everything, all at once. The efficient order is as follows:

  • List the critical processes. Invoicing, access to code or files, customer support, production: rarely more than five or six genuinely vital lines.
  • Quantify their impact. How much does an hour of downtime cost, a day, a week? This is the heart of the business impact analysis (BIA).
  • Set RTO and RPO per process. Not all share the same urgency: access to code may demand recovery within thirty minutes while invoicing tolerates twenty-four hours.
  • Write the DR plan, then extend it into a BC plan. You first cover IT, then move up towards overall continuity.

This is exactly the outline our generator produces: thirteen chapters, from presentation to validation, and sixteen operational appendices. The document is assembled from your data instead of copying a generic Word template.

The proof, first on ourselves

The generator's reference dataset is not a fictional example: it is SYAGA's own recovery plan, reference SYAGA-SMCA-PRA/PCA-v3.5. Six critical processes are documented there with their quantified recovery objectives, from the thirty minutes of RTO for access to source code to the twenty-four hours for invoicing. We sell you the method we apply first to ourselves: a document aligned with the requirements of ISO 22301, never a certification.