RTO and RPO: how to set the right objectives before you sign
Two acronyms come up in every recovery contract: the RTO and the RPO. They are not interchangeable, and confusing them skews the whole sizing. The RTO is a duration: how much downtime you tolerate. The RPO is a volume: how much data you accept losing. Setting them correctly, process by process, is the step that determines how relevant the plan is and how much it costs.
RTO: the tolerable downtime
The RTO, for Recovery Time Objective, is the maximum delay between the moment disaster strikes and the moment the process must have restarted. An RTO of two hours means the activity in question must be back up in two hours, not a minute more. It is the objective that dictates the recovery infrastructure: the shorter the RTO, the more pre-positioned resources and automated procedures are needed.
RPO: the acceptable volume of data to lose
The RPO, for Recovery Point Objective, is the recovery point in time: how far back into the backups you can go without the loss being unacceptable. An RPO of twenty-four hours corresponds to a daily backup: in the event of disaster, you lose at worst the current day. An RPO close to zero assumes continuous replication, and costs, depending on the provider, ten to a hundred times more than an RPO of twenty-four hours. So you do not aim for zero by reflex: you justify it process by process.
The method: quantify before you write
You do not guess an RTO and an RPO: you derive them from the business impact, measured by the business impact analysis (BIA). The approach has four steps:
- List the critical processes, rarely more than five or six for an SME.
- For each, measure the cost of an hour, a day, a week of downtime.
- Derive an RTO and an RPO proportionate to that impact, not to intuition.
- Check that the existing infrastructure meets these objectives, or quantify what needs to be added.
Our reference plan illustrates this gradation: reference SYAGA-SMCA-PRA/PCA-v3.5, six critical processes, an RTO of thirty minutes for access to source code, of two hours for emergency support, up to twenty-four hours for invoicing, and RPOs ranging from zero to seven days depending on criticality. These values are those of our own plan, presented as an example of what the generator produces, not as a service commitment towards you.
The contractual trap to avoid
The number-one trap found in requirements briefs is writing an RTO with no functional scope. Promising recovery in two hours means nothing if you do not state of what: the server powered on, the application reachable, or the business process genuinely operational with its data up to date? The same RTO of two hours can cover three very different realities. Before you sign, insist that each recovery objective comes with a scope set out in writing. It is one of the clauses we recommend in our page on the requirements brief.